Home / Questions / Prefab ADUs

Prefab ADUs

What does a prefab ADU really cost all-in?

Published 2026-11-25

Short answer

Plan on roughly $150,000 to $350,000 all-in for a typical detached prefab ADU. The unit itself is often only half to two-thirds of that; foundation, utilities, permits and delivery make up the rest, and site work is the least predictable part.

The sticker price is only the unit

Most prefab builders quote the factory-built structure. That number leaves out the work that happens on your lot: the foundation, running water, sewer and power to the unit, permits, delivery and setting it in place.

Industry cost guides put a complete prefab ADU project at about $80,000 to $250,000+ for smaller units, and $150,000 to $350,000+ for a typical one once everything is counted. Once those on-site costs are in, a prefab can end up close to the price of a site-built ADU.

Where the money goes

ItemTypical rangeWhat drives it
The unit (factory price)$60,000–$280,000Size, finishes, number of modules
Foundation and site prep$10,000–$60,000+Slope, soil, slab vs. piers, access
Utility connections$8,000–$30,000Distance to sewer, water and power; panel upgrade
Permits and plan review$2,000–$20,000City fees; size of the unit
Delivery and crane$6,000–$25,000Distance from factory, crane size, tight lots
Contingency10–15% of the totalSurprises found once digging starts

Utilities are the budget wildcard

The longer the run from your house's sewer, water and electrical lines to the ADU, the more trenching you pay for. Running new lines to a detached unit commonly adds $8,000 to $30,000, and sewer is usually the most expensive part because it has to flow downhill by gravity.

Separate water and sewer hookups also bring city connection charges. A Washington builders' study found average ADU connection charges of about $5,300 for water and $5,800 for sewer. Sharing your house's existing lines is usually cheaper, though you may still need an electrical panel upgrade.

How to keep the total down

  • Place the ADU close to your house's sewer cleanout and electrical panel to shorten trenching.
  • In California, keep it at 750 square feet or less: state law bars impact fees on ADUs that size, and larger units can only be charged in proportion to the main house.
  • Ask whether your city waives permit fees for small ADUs; some, like Dublin, CA, do.
  • Get a site visit before you sign. A builder who has seen your lot can quote foundation and utilities, not just the unit.
  • Keep a 10–15% contingency. Rock, poor soil or an old sewer line are only found once work starts.

Is prefab still worth it?

Prefab's main advantages are speed and a predictable unit price: the structure is built in a factory while your site is prepared. On a flat lot near existing utilities, it is often the fastest way to a finished ADU. On a steep or hard-to-reach lot, delivery and site work can erase the savings, so compare an all-in prefab quote against a local builder's quote before you decide.

Options we've reviewed

Read the full prefab adus guide →

Questions people ask

Do prefab ADU prices include installation?

Sometimes. Some builders, like Samara and Abodu, sell turnkey packages in the areas they serve; others quote only the unit and leave the foundation, utilities and permits to you or a local contractor. Always ask what the quote includes.

How much do permits cost for an ADU?

It varies widely by city, from a few thousand dollars to $20,000 or more. California bars impact fees on ADUs of 750 square feet or less, which keeps permit costs lower for small units there.

Can I share utilities with my house?

Usually, yes. Most ADUs share water and sewer with the main house, which avoids separate connection charges. Separate meters make more sense if you plan to rent the unit or sell it separately later.

Sources

Rules, prices and programs change. Check with your local permit office or the seller before you commit.